FS COMPLETION SYSTEM

Now Delivering Continuous Plug & Perf Operations

Average Completion Time Improves by 43% for Large Independent Operator

Powder River Basin

Major Operator Moves from Last Quartile to 1st, Realizes 57% Efficiency Gain

Bakken Basin, USA

~30 Days Saved on 5-Well Pad, Projected Costs Savings of $4.5M

Permian Basin, USA

Operator Performs 73% Better than All-Operator Basin Average 

Powder River Basin, USA

Independent Operator Achieves 98% Operational Efficiency

Permian Basin, USA

Pumping Efficiency Maximized

At Downing, we’re changing the way the industry fracs. We’ve engineered the industry’s first remotely-operated frac stack with efficiency and safety in mind. This integrated system is comprised of a multi-chamber hydraulic valve, quick-connect latch and automated ball dropper that enables continuous frac operations even on the most complex completions. The result? Fewer days on well, increased rate of well completion, vastly reduced repair costs, and red zone-free operations –  all while reducing your AFE.

  • Maximizes operational efficiency, up to 98%
  • Reduces repair costs by up to 93%
  • Increases daily stage completions
  • Increases wells completed per frac crew per year
  • Reduces cost per well and overall annual completion costs
  • Eliminates risk of cutting wireline
  • Eliminates red zone operations
  • Automation reduces human error and associated NPT/unplanned costs
  • Delivers automated metrics for reporting

Delivering First-Quartile Results

With the FS Completion System (FSCS), we’re moving operators to best-in-class efficiency. Through continuous operations, the FSCS reduces your stimulation days all while reducing costs per well. Check out the case study to see how we moved 2 operators in the Bakken Basin to the first quartile.

Three FS Valves from Downing are shown above frac stacks.

Continuous Operations

How It Works

The FSCS brings continuous frac operations to plug and perf comletions. Compared to conventional methods, transition times are reduced up to 95%, valve greasing and repair costs are significantly reduced, valve failures and cut wireline are essentially eliminated, and red-zone operations are a thing of the past. Watch our video to learn more.

Get Continuous Operations & Maximize Pump Efficiency with Downing

With the FS Completion System, we’ll maximize your completion efficiency and improve your bottom line – all while delivering you freedom from downtime, unplanned costs and safety risks. Contact us to learn more.

    To use CAPTCHA, you need Really Simple CAPTCHA plugin installed.
    Type the code above

    Delivering freedom from…

    white Cost

    Unplanned Costs

    white Time

    Downtime

    white Safety

    Red Zone Risks