Jones Energy Completes 4-Well Zipper Pad in Record Time with the FS Completion System

“What I love most about the FS Completion System is that we can pump 20 hours a day,” according to Michael Dean, Operations Manager for Jones Energy. Read how the FS Completion System helped Jones increase average daily operations in the MidCon by 21% and decrease projected days on well by 3.7 days.

Jones Energy Completes 4-Well Zipper Pad in Record Time with the FS Completion System

“What I love most about the FS Completion System is that we can pump 20 hours a day,” according to Michael Dean, Operations Manager for Jones Energy. Read how the FS Completion System helped Jones increase average daily operations in the MidCon by 21% and decrease projected days on well by 3.7 days.

Primexx Energy Improves Completion Efficiency, Reduces Average Cost per Well by $150k with FS Completion System

“The FS Completion system has completely changed the plug and perf process,” according to Phillip Douget, Integrated Service Planning Manager for Primexx Energy. Read how the FS Completion System helped Primexx save 3.5 days on well and increased daily stage completions by 40% on average.

Primexx Case Study Thumbnail Image

Primexx Energy Improves Completion Efficiency, Reduces Average Cost per Well by $150k with FS Completion System

“The FS Completion system has completely changed the plug and perf process,” according to Phillip Douget, Integrated Service Planning Manager for Primexx Energy. Read how the FS Completion System helped Primexx save 3.5 days on well and increased daily stage completions by 40% on average.

Moving Operators to Best-in-Class Efficiency with the FS Completion System

Read an in-depth report of completion efficiency ratings for 29 E&P operators in the Bakken Basin. This case study compares 2018 vs. improved 2019 results with the FS Completion System (FSCS). Based on stimulation days per 1,000 ft of lateral.

Moving Operators to Best-in-Class Efficiency with the FS Completion System

Read an in-depth report of completion efficiency ratings for 29 E&P operators in the Bakken Basin. This case study compares 2018 vs. improved 2019 results with the FS Completion System (FSCS). Based on stimulation days per 1,000 ft of lateral.

E & P Operator Maximizes Frac Efficiencies and Realizes Multi-Million Dollar Annual Savings Using the FS Completion System

One operator saved $42Million by increasing annual wells completed per frac crew by 33%. See how the FS Completion System is eliminating wireline transition time on zipper fracs leading to more stages completed per day and reducing days on well.

E & P Operator Maximizes Frac Efficiencies and Realizes Multi-Million Dollar Annual Savings Using the FS Completion System

One operator saved $42Million by increasing annual wells completed per frac crew by 33%. See how the FS Completion System is eliminating wireline transition time on zipper fracs leading to more stages completed per day and reducing days on well.