Offline Cementing

Cement surface, intermediate or production casing offline

The Downing off-line cement system saves hours of rig time by enabling the operator to move the rig to the next well while cementing on the current well, saving valuable rig time.  Downing’s system allows the cementing operations to be conducted after drilling is complete, casing installed, and the rig moved to the next well, saving up to 12 hours of rig time.  

MB-4 Offline Cementing 3D rendering

Increase Time Savings

  • Save up to 12 hours of rig time per casing string

Application:

  • Batch Drilling

Key Features: 

  • Available for:
    • Surface casing
    • Intermediate casing
    • Production casing

Interested in learning more about offline cementing from Downing?

 

 

Email us at sales@downingusa.com

Or Call Us Now: ‪(405) 248-9501