Learn how operators using Downing are solving drilling and completion challenges and move their operations in one direction: forward.
“In the Haynesville, continuous pumping technology employed in 2023 has led to a greater than 20% increase in efficiencies relative to previous zipper operations.” – Chesapeake Q2 2023 Earnings Release
Primexx shares the significant impact Freedom Series had on their ESG metrics over the course of 1 year.
“What I love most about the FS Completion System is that we can pump 20 hours a day,” according to Michael Dean, Operations Manager for Jones Energy. Read how the FS Completion System helped Jones increase average daily operations in the MidCon by 21% and decrease projected days on well by 3.7 days.
“What I love most about the FS Completion System is that we can pump 20 hours a day,” according to Michael Dean, Operations Manager for Jones Energy. Read how the FS Completion System helped Jones increase average daily operations in the MidCon by 21% and decrease projected days on well by 3.7 days.
“The FS Completion system has completely changed the plug and perf process,” according to Phillip Douget, Integrated Service Planning Manager for Primexx Energy. Read how the FS Completion System helped Primexx save 3.5 days on well and increased daily stage completions by 40% on average.
“The FS Completion system has completely changed the plug and perf process,” according to Phillip Douget, Integrated Service Planning Manager for Primexx Energy. Read how the FS Completion System helped Primexx save 3.5 days on well and increased daily stage completions by 40% on average.
Read an in-depth report of completion efficiency ratings for 29 E&P operators in the Bakken Basin. This case study compares 2018 vs. improved 2019 results with the FS Completion System (FSCS). Based on stimulation days per 1,000 ft of lateral.
Read an in-depth report of completion efficiency ratings for 29 E&P operators in the Bakken Basin. This case study compares 2018 vs. improved 2019 results with the FS Completion System (FSCS). Based on stimulation days per 1,000 ft of lateral.
One operator saved $42Million by increasing annual wells completed per frac crew by 33%. See how the FS Completion System is eliminating wireline transition time on zipper fracs leading to more stages completed per day and reducing days on well.
One operator saved $42Million by increasing annual wells completed per frac crew by 33%. See how the FS Completion System is eliminating wireline transition time on zipper fracs leading to more stages completed per day and reducing days on well.