The Freedom Series Completion System eliminates the issues that prevent continuous pumping 24 hours per day, every day. Transition time – gone. Pump maintenance – handled. Gate valve-related NPT – significantly reduced.
The Freedom Series Completion System with Hot Swap integrates and automates the entire surface system into one. From automated fill, equalize, and drain to automated pump swapping, the Freedom Series Completion System with Hot Swap enables fracturing 24/7. With a simple, single click, the system transitions the zipper valves from one well to the other, opening the second well and subsequently shutting-in the first well, all while pumping. The transition is instantaneous with the total time between stages less than 30 seconds. When a pump goes down, no issues. With Downing’s Hot Swap system, the pump is isolated, shut in, and exchanged, all without entering the red zone and while you continue to fracture with your remaining pumps. With Cold Bore standard and Corva’s digital twin, you have easy access to all your pad data. Whether a zipper frac or simulfrac, the Freedom Series Completion System with Hot Swap simplifies your operation.
The benefits of the Freedom Series Completion System accrue to both the operator and the pumper. For the operator, lower cost frac operations and bringing on production faster. For the pumper, up to a 50% increase in pump utilization translating into higher returns on capital deployed. To illustrate, assume a pumper fleet, with 32 crews, averages 16 hrs pumping per day, moving this to 23.5 hrs/day adds the equivalent of 13 crews without additional capital spend, representing a step change in completion efficiency analogous to the efficiency gains seen in drilling 20+ years ago when the industry transitioned from tricones to PDC bits.
FS Hot Swap Automated Pump Swapping including Automated Missile
Automated Lubricator
FS iControl Automated Valve Controller
Interested in learning more about 24/7 Fracturing with the Freedom Series Completion System with Hot Swap?
Unplanned Costs
Downtime
Red Zone Risks