At Downing, we’re changing the way the industry fracs. We’ve engineered the industry’s first remotely-operated frac stack with efficiency and safety in mind. This integrated system is comprised of a multi-chamber hydraulic valve, quick-connect latch and automated ball dropper that enables continuous frac operations even on the most complex completions. The result? Fewer days on well, increased rate of well completion, vastly reduced repair time, and red zone-free operations – all while saving you from the daily (and hourly) headaches of traditional plug and perf operations.
The FSCS brings continuous frac operations to plug and perf operations. Compared to conventional methods, transition times are reduced up to 95%, valve greasing and repair costs are significantly reduced, valve failures and cut wireline anre essentially eliminated, and red-zone operations are a thing of the past. Watch our video to learn more.
Witht he FS Completion System (FSCS), we’re moving operators to best-in-class efficiency. Through continuous operations, the FSCS reduces your stimulation days while reducing costs per well. Check out the case study to see how we moved 2 operators in the Bakken Basin to the first quartile.
With the FS Completion System, we’ll deliver continuous plug & perf operations and improve your rate of well completion – all while delivering you freedom from downtime, unplanned costs and safety risks. Contact us to learn more.
Unplanned Costs
Downtime
Red Zone Risks