At Downing, we’re changing the way the industry fracs. We’ve engineered the industry’s first remotely-operated frac stack with efficiency and safety in mind. The FS Completion System enables continuous frac operations, translating to fewer days on well so you can complete more wells in less time with fewer frac crews. The result? Significant cost savings and a boost to your bottom line.
Witht he FS Completion System (FSCS), we’re moving operators to best-in-class efficiency. Through continuous operations, the FSCS reduces your stimulation days all while reducing costs per well. Check out the case study to see how we moved 2 operators in the Bakken Basin to the first quartile.
The FSCS brings continuous frac operations to plug and perf operations. Compared to conventional methods, transition times are reduced up to 95%, valve greasing and repair costs are significantly reduced, valve failures and cut wireline are essentially eliminated, and red-zone operations are a thing of the past. Watch our video to learn more.
With the FS Completion System, we’ll maximize your completion efficiency and improve your bottom line – all while delivering you freedom from downtime, unplanned costs and safety risks. Contact us to learn more.
Unplanned Costs
Downtime
Red Zone Risks